The beneficiary is authorized to carry out the project of extension of the Walt Disney studios park on the commune of Chessy as prescribed in the articles of this decree.
The Walt Disney Studios Park extension project covers approximately 30 hectares that will be developed for the realization of the following attractions:
A pleasure lake with an area of 2.87 hectares with restaurant and services on 2200 sqm approximately.
A new Frozen land on a footprint of about 7000 sqm.
A new Land Star Wars on a footprint of about 10,200 sqm.
The project integrates the realization of two types of water body:
A permanent body of water that the area at the nominal level is 2.87 hectares.
Several non-permanent water bodies that correspond to the preferred open-water infiltration areas proposed for the management of small rains. The cumulative area of these entities is 0.28 hectares.
The cumulated total area of all the water plans thus reaches 3.15 hectares.
This 2.87 hectares recreational lake is a logistical element for the realization of the shows planned in association with the new lands objects of the extension of the park: pyrotechnic show, light show, aquatic animation.
This body of water will not receive activity practiced by the public, like sailing or swimming. Its use is not intended to ensure the quantitative or qualitative control of water runoff from the site, although it is a receptacle for falling >rainwater. It also has no ecological vocation.
Located in the center of the extension project it consists of three entities:
The main circular water body, 1.67 hectares in size, is the center of the extension and support for show activities.
A rectangular technical basin with a surface of 0.53 hectares, place of storage and maintenance of the equipment >intended for the realization of the shows.
An area of 0.67 hectares of water connects the two entities to allow boats dedicated to show logistics to reach the main basin from the technical basin.
Three structures also contribute to the maintenance of the pleasure water plan, a bridge spanning the waterway, with an overflow device and a circulation and treatment device for the water mass designed to ensure recirculation and physical treatment of the 67,000 m³ it contains at the rate of twice a week without the addition of any chemical or biological additives. The treatment system will include granular filtration (sand filter) and physical disinfection (ultraviolet reactors).